In collaboration with Iranian Watershed Management Association
Volume 16 (2024-2025)
Volume 15 (2023-2024)
Volume 14 (2022-2023)
Volume 13 (2021-2022)
Volume 12 (2020-2021)
Volume 11 (2019-2020)
Volume 10 (2018-2019)
Volume 9 (2017-2018)
Volume 8 (2016-2017)
Volume 7 (2015-2016)
Volume 6 (2014-2015)
Volume 5 (2013-2014)
Volume 4 (2012-2013)
Volume 3 (2011-2012)
Volume 2 (2010-2011)
Volume 1 (2009-2010)
Investigating sediment loads of Iranian rivers, case study: Western Azerbaijan

Davood Nikkami; Reza Sokouti Oskuee; Ebrahim Brooshkeh; Faniz Heshmati

Volume 5, Issue 4 , March 2014, , Pages 266-274

https://doi.org/10.22092/ijwmse.2014.101877

Abstract
  Eroded soil particles within watershed areas are transported in three shape of dissolved, suspended and bed loads by river water discharge. Knowing the amount of suspended and bed loads are necessary in estimating sediment yield of watersheds. Usually, suspended load is measured daily in hydrometric ...  Read More